On 5th March 2015, I made a presentation to the Bus Station Stakeholders Meeting of current contextual research in relation to the Bus Station project and the Link Bridge Study.
I thought it may be of interest to post all these images here. There are a fair few – so bear with it ! – it is useful to know how the research is being delivered and what is shaping my approach. The screenshot image below gives a clear idea of the number of images I am posting – stick with it as there are some great images and quotations…
I have credited all sources of information and am grateful to all organisations and individuals who have assisted me thus far. Where permissions to use images have not been possible, these images have been withdrawn from posting online.
Where Ordnance Survey Maps have been used, they are all out of copyright, however, I have added a credit – ‘Reproduced from the …date… Ordnance Survey Map’, which the Ordnance Survey suggest on their website.
At the scale above – the individual images are not so clear – so I have added all the images individually. It makes for a long post – but hopefully you will find something of interest here ! Here goes – Image No.1 …
A quick site visit yesterday – 19th March – to see the manifestation sample installed in the M1 / M2 Block entrance lobby. This is one of the interpretive artworks on site – part of the public realm and public art enhancements.
This is the interior courtyard space, which we know as The Place – this is a public space for both residents and pedestrians alike. The site will provides a new pedestrian route along a desire line from Chelmsford Station, through to the town centre.
The York Stone steps with inset granite text are manufactured by the Ashfield Group.
Interior of entrance lobby – with sample vinyl manifestation taped to the glazing. The weather was really dull & overcast. The printed white inks don’t jump out very much. If it had been bright and sunny, the design would cast a myriad of shadows onto the frame and floors. Will have to wait & see how that works out !
This week saw the delivery and installation of the first bespoke cast concrete units to site. Wilson Massie of Balfour Beatty Living Places has let me use his images taken during the works to install. Balfour Beatty Services are delivering and installing all the project on site.
The units are manufactured by CCP Ltd – Cornish Concrete Products, nr Truro.
I spent yesterday – 17th March 2015 – in Reading, working in the design room at VGL Ltd with one of their production designers, James, to build and sample the final production artwork for the glazing manifestation to be installed in the M1 / M2 Block Entrance Lobby, Central Chelmsford. VGL really do put in the extra mile to get exactly what I want – it is very much appreciated.
We had a full size sample printed and tomorrow I am going to site to see it installed for final approval by the project team.
This is the visual that was produced – it is presented against a black background because the artwork is printed in many layers of opaque and transparent white overlaid one on another. – Durst Print white only in reverse onto Madico Optically Clear vinyl, applied to the inside face of glazing.
‘Outside Wyndham Court a great deal of the footpath and landscaping is down and this gives a glimpse of how the scheme is going to look. Block paving of the public car park has started, trees are in and yesterday the first of the new bespoke stone benches was crane lifted into place.’Taken from the Southampton Station Quarter update bulletin, 18th March 2015, Balfour Beatty Living Places.
Bespoke benches during installation. Unfortunately, one of the 6 units has a lighter finish than the others. This can be remedied post installation on site by the manufacturer CPP Ltd.
On Thursday 12th March I flew down to Newquay to visit CCP Ltd – Cornish Concrete Products – to review production on the first set of bespoke benches for Southampton Station Quarter. I was meeting up with Simon Taylor, Urban Design Manager –Southampton Highways Partnership, Balfour Beatty Living Places, who is the Design Manager for the Station Quarter project. Simon met me at Newquay Airport & we drove down to Bissoe to CCP’s manufacturing plant.
I left Ramsgate on High Speed 1 for London, St Pancras, then by Tube to Victoria to pick up the Gatwick Express & Gatwick to Newquay by Twin Prop and from there by car to Bissoe – easy ! A great day – but one delay along the way could have been a disaster – fortunately it was brilliant.
The units below are the first to be manufactured and are, as such the sample test for the project. We will be looking to iron out any issues presenting at this stage and develop a methodology for ensuring quality control through the production period. The Type C unit – is only one of several bespoke profiles being developed – with each profile there are accompanying bespoke ends and specials to be made.
This is a single unit, part of a six unit seating set for the landscape works. The seating forms part of the interpretation and public art created for the project. The units as seen here have yet to have the etching treatment to expose the surface aggregates, so appear quite light in colour. The finished colour and aggregate mix reflect the multi blend granite paving used throughout the site and is informed by the geology of the site – alluvial gravels – which were at one time quarried nearby in the area now occupied by the Civic Centre. These gravels would have formed the beach of the River Test Estuary, which was – until 175 years ago – to be found where Blechynden Terrace now stands.
We have selected the Blackhill Aggregate – White Cement – Heavy Etch sample to work with –
The composite image below, illustrate the evolution of the Type C Bench. The basic section is added to with bespoke and varying ‘ends’, with some units being further cast with lighting recesses.
I particularly like to see the timber joinery and craftsmanship which goes into the moulds. No-one else really sees this – and the general public generally have no idea of the work that goes on behind the scenes to achieve the objects they see in the public realm.
Finally caught up with progress on the Central Chelmsford Project on Thursday 19th February.
I hadn’t been to site since October 2014 & things had really moved on, with one block of the development already open to residents. The public realm is still ongoing, which includes the embedded artwork and interpretive text.
The York stone steps with inset granite text was manufactured & supplied by the Ashfield Group. The installation on site is a very time consuming and bespoke process. I am looking forward to seeing the works all cleaned up and finished.
The large sandblasted granite platform seat has been installed, but not completely finished as yet. This element, along with the sandblasted paving text was manufactured & supplied by Hardscape.
The central courtyard is in progress, with brick built raised beds with trees, shrubs and grasses. All hard landscape concept design and planting for the scheme is by Area Landscape Architects.
The interpretation work I have done is mainly embedded within this scheme as seating, paving & steps. The text – as seen below – sandblasted into Royal Green Granite slabs & set into York Stone paving – has not yet been cleaned & is very dusty and dirty from continuing building works. The site is closed to the public. This will however, become a busy pedestrian thoroughfare when completed. .
The Engine House was one of a pair of Engine Houses on the Ynysfach Ironworks site. ‘The Glamorgan-Gwent Archaeological Trust Ltd undertook investigations at Merthyr Tydfil College, on the site of the former Ynysfach Ironworks, which began in August 2011 and were completed by January 2012. Archaeologists from the Trust excavated and recorded structures belonging to the former ironworks, which had survived unexpectedly well, buried underneath the college buildings’.
To see the amazing animated 3D reconstruction of the site. produced as part of the interpretation for the project, press on this link. A permanent exhibition of this project can be seen at The College, Merthyr Tydfil, which is built upon this site.
I met withSteve Brewer & Ceinwen Statter , members of the Merthyr Tydfil Historical Society, who operate out of the recently restored Engine House of the former Ynysfach Iron Works. Mary Owen – Author of book on the New Rectory of Merthyr Tydfil, was mentioned as someone who may have some insight on Swan Street history. Clive Thomas, the author of a history of Cae-Draw School, was also mentioned. The Merthyr Tydfil Historical Society also publish the Merthyr Historian, which is a 26 Volume history of the town from every source possible. Published from 1976 to the present, it has some engaging and surprising stories, records & contributory essays and images from many individuals. A great resource document ! A set of these publications is available in the Merthyr Tydfil Library.
The site of the former Ironworks is now mostly occupied by The College, Merthyr Tydfil,the original ironworks being demolished and lost before and during the 1960’s.
We discussed the site specific history of the new Bus Station site on Swan Street and references to a building called ‘The Rectory’, which is show on old OS Maps, but is not referred to in any written text I can find. Alan and his colleagues are assisting in researching this. The wider area around Swan Street is also rich in history and community, which needs to be addressed in this contextual study.
The new College site – although first developed in the 1960’s – is historically relevant to the Link Bridge project, as not only was this the site of the Ynysfach Ironworks, part of the Cyfarthfa Ironworks, but the public realm and highway in front of the College and in-between it and the River Taff, was the site of the Glamorganshire Canal. There was a Lock Gate here, called Parliament Lock. An Archaeological Report was made by the Glamorgan-Gwent Archaeological Trust(Contracts Division) to support the Archaeological Watching Brief on Parliament Lock during pipe laying works in October 1995. The Report was prepared for Ove Arup & Partners who carried out the works.The report is really interesting. – click on Parliament Lock, above –
Parliament Lock Gate and House is in the bottom right foreground of this image of the Glamorganshire Canal. The bridge, seen at the middle far right of this image, is the Ynysgau Iron Bridge across the River Taff, built in 1799 by Watkin George for the Cyfarthfa Ironworks.
12th February 2015 – Treforest, South Wales – the birthplace of SIR TOM JONES !
I met with Dr Chris Evanstoday to discuss the history of iron production in Merthyr Tydfil and the legacy and impact of this on contemporary Merthyr Tydfil and its aspirations & current regeneration programme. This is in light of contextual research I am doing in regard to the new Bus Station project and Link bridge feasibility study.
Francis Crawshay – an eccentric member of the Crawshays of Cyfarthfa, who had portraits of his workers painted which was, at the time highly unusual, giving a remarkable insight into the lives of ordinary working people. He was something of a Druidic character, building stone circles and mounds.
The Upland Landscape of the Brecon Beacons & its importance in both the past and the future of Merthyr Tydfil. Merthyr is a product of this upland landscape & could make much more of this relationship.
The Taff Trailand how visitors could experience & relate to Merthyr as a gateway to the Brecons.
The Creativity and Flair of the great engineers and innovators who were central to the Industrial Revolution in Merthyr not being sufficiently celebrated. Watkin George,William Edwards, William Williamsworked at the cutting edge of technology and innovation. Even factory buildings were classically proportioned. Merthyr was a hub of creative knowledge, that became not only world famous, but exported this knowledge all over the world – even sending expertise to set up new Ironworks in Russia for example. The town generated and maintained international contacts, becoming an international crossroads of industry.
Elemental Processes of ironworking – extremely labour intensive. The ability to standardize products and replicate to order under these conditions was testament to the degree of control over processes these manufactories had. Confidence in their technology and how to utilise it successfully
Impact on landscape – early extraction methods included damming rivers and streams and then breaking the dam to allow the raging waters to scour the top soils and expose the iron ore beds. Cinder Tips, & Slag Heaps
Power – the control and management of water was at the heart of Merthyrs advancement. Transport was the other – Canals, Tramways, Railways, Roads, River.
Power – Napoleonic Economy & Rise to Wealth – Atlantic Trade – Iron and Slaves – Dr Chris Evans Research