The proposals for the PCC Amphitheatre Steps and Seats are currently being considered by the client. In the meantime I am working up some drafts for the use bespoke highly detailed letters in a variety of materials ranging from granite and natural stones, to cast iron, enamelled steel, glazed architectural faience and Terrazzo. These letters will be fixed into the rebated text detail within the cast concrete seat riser, which will be 450mm high. Each bespoke letter can be 400mm high. The depth of the rebate will vary from 5mm to 30mm, however, the bespoke letters will all be best at 30mm deep, keeping them as robust as possible.
‘Under the Shadow of the Crane’ was initially an idea for a large scale granite ‘drawing’ to make up the pavement and public realm of the Crane Point site. Water jet cut granite slabs in two colours would form this extensive mosaic pavement, making permanent the ephemeral passing shadow of the crane, creating a physical memorial to the industrial heritage of the Riverside site.
Tuesday 12th and Wednesday 13th May 2015 -On Tuesday I travelled up to Cardiff from Ramsgate, Kent for a design meeting with Capita, the project architects. I was accompanied by Simon Fenoulhet of Celfwaith, who developed and is overseeing the Public Art Strategy for Merthyr Tydfil County Borough Council along with Mererid Velios. Great to have someone with his experience with whom to navigate the project !
We discussed the draft development of the building and landscape and how the creative contextual research and analysis of the site, which I have been doing in order ‘to influence the design process’ is becoming a part of the interpretive strategy for the building. Once this process becomes more involved and collaborative then I hope we will see some really interesting narratives and themes emerging. We are continually having to address the function of this site as a Bus Station and interchange and the demands it brings to the project. That notwithstanding, the interpretation and contextual needs and aspirations for this site have to be seriously considered.
Wednesday was our final team meeting before the presentation to the Design Commission For Walesscheduled for Thursday 21st May.