Southampton Station Quarter North was shortlisted for the 2016 Solent Design Awards, which were awarded in November 2016 – A much needed update on the project. Better late than never !
Although our project was not one of the winners… it was very encouraging that the collaborative approach which delivered the project and the role of our Champions Group, which endured throughout the build programme was recognised via the shortlist process.
‘The Solent Design Awards are all about the encouragement of quality place-making; schemes that create special places, lift communities, create richer experiences … not just iconic buildings, but also the places in-between’.
The following set of images from the site were produced by Wilson Massie of Balfour Beatty Living Places – thanks Wilson !
The artwork ‘Canal Shore’ runs for almost 200m along the South side of Blechynden Terrace. Bespoke extra wide Black Basalt kerbs are inset with white granite text referencing the site.
With thanks to Hardscapefor their excellent collaboration on the ‘Canal Shore’ artwork.
If you know Southampton well – you may never really notice the Station signage. Things may be a little tricky if you are a visitor. The arrival and departure from a great sea city like Southampton surely needs a bit of a signage upgrade. I am no typographer and this is a specialist area – but I can’t resist an opportunity –
It’s been a while since I posted an update on the Station Quarter Project –
I met up on site with Simon Taylor – Urban Design Manager, Balfour Beatty Living Placesand Pete Boustred – Transport Policy & Sustainable Travel Team Leader at Southampton City Council. I was first commissioned to work on the interpretive and site responsive elements of the project by Simon at BBLP in 2012. We have worked together several times previously in the City. BBLP are delivering the project for Southampton City Council.
Massive changes since my last visit if you look at earlier posts, but brilliant to see the project coming together so well. The amphitheatre steps, part of the Phase 2 works on Wyndham Place have arrived and have been lifted into place. There are a number of other structures still with the manufacturer and these are expected to arrive over the coming weeks. The installation of the large-scale bespoke cast concrete benches, amphitheatre steps and retaining structures manufactured by CCPwill continue over the coming weeks. Hopefully I will get down to Southampton again soon to record more progress.
What was a real pain was that although it was a brilliant blue day – this part of the site was in deep shadow, so the images are a bit too dark to do the work justice !
Other cast concrete works are also on site –
These benches are on the Station Forecourt, immediately as you enter or exit the Station building. This is one section of a large curving two tier bench and way-finding feature within the scheme.
Works are progressing well on site – in fact the scheme is very much in it’s final phase of works to complete the landscape around the site.
Most of the interpretive public art elements are now installed throughout the site.
The content of many of these images you may be familiar with – but the installation is much nearer to completion with the soft landscape details really making an impact on the interpretation and public art elements. Area Landscape Architectsare responsible for the external landscape concept, design and strategy and have created a sensitive and wonderful scheme, which I have been fortunate to work within.
“Never will the nations of the earth be well governed until both sexes, as well as all parties, are fully represented and have an influence, a voice, and a hand in the enactment and administration of the law”.Anne Knight, 1847.
A quick site visit yesterday – 19th March – to see the manifestation sample installed in the M1 / M2 Block entrance lobby. This is one of the interpretive artworks on site – part of the public realm and public art enhancements.
This is the interior courtyard space, which we know as The Place – this is a public space for both residents and pedestrians alike. The site will provides a new pedestrian route along a desire line from Chelmsford Station, through to the town centre.
The York Stone steps with inset granite text are manufactured by the Ashfield Group.
Interior of entrance lobby – with sample vinyl manifestation taped to the glazing. The weather was really dull & overcast. The printed white inks don’t jump out very much. If it had been bright and sunny, the design would cast a myriad of shadows onto the frame and floors. Will have to wait & see how that works out !
Hardscape have just completed sandblasting the large granite platform seat for my project at Burgess Springs, Central Chelmsford. They sent over a couple of images yesterday. Looking pretty good from here – really want to see more images !
Hard to convey to convey the size of this piece of work – each slab is approx. 1200mm x 1200mm.
I think they have done a great job – cant wait to see it installed on site.