The last pieces of production artwork have now been signed off. Most of the front elevation of the building has now been installed. Weirdly I’ve not yet been up to see it. Been pretty busy here in Ramsgate.
A good thing is that Guy Topping commissioned a further piece of work from me – a 7m diameter granite mosaic of a large flower for the main entrance threshold. The manufacturing work was commissioned from Bannister Hall Landscape SuppliesĀ and will be manufactured in China.