Blog, Natural World, Public Art, Public Realm, The Flower Bowl Sub-Station April 12, 2018 Christopher Tipping Leave a comment The last 2 elevations are now in progress, having signed off the artwork for the Elevations 7 & 8, the Sub-Station Building and Rovero End. My work is now pretty much done here. Going to site to see it installed is now a priority. The Flower Bowl. Draft for Elevation 8 – Sub Station and Rovero. Image: Christopher Tipping The Flower Bowl. Draft for Elevation 8 – Sub Station and Rovero. Image: Christopher Tipping The Flower Bowl. Draft for Elevation 8 – Sub Station and Rovero. Image: Christopher Tipping The Flower Bowl. Draft for Elevation 8 – Sub Station and Rovero. Image: Christopher Tipping